Â
Specification
Others: | ||
Design | professional design for your requirment:include choose the correct type for you,CAD drawing | |
Price | direct Manufacture price,according to your quantity,payment | |
Package | standard export package | |
Payment |
30% prepaid T/T,L/C at sight EXW/FOB/CIF/CFR |
|
Shippment | FOB NANJING,FOB SHANGHAI | |
CFR/CIF destination port | ||
Quick Delivery. | Within 15 days for ordinary order quantity. Big production capacity allow us in a position to make quick delivery. | |
Certification | we can provided to ISO9001/CE/SGS for you |
Main Structure&Parts Of Rack Units
Flow Chat
Packing &Â Shipping
Welcome Customer
Certifiations
About Botro Racking
- A leading &Â professional manufacturer of storage shelving &Â racking in China.Â
- More than 10 years experience in the field of producing storage metal racks.
- Our factory covers over 11, 000 square meters.
- More than 100 professional and experienced staffs.Â
- exclusive manufacturing machines and equipment.Â
- Production capacity up to 1,500 tons every month.Â
Â
FAQ
1. Q: Are you a factory or trading company?Â
A: We are a factory. Warhouse Rack is one of our featured products.
2. Q: Where is your factory located? How can I visit there?Â
A: Our factory is located in Tianchang City, Anhui Province, China, close to Nanjing. You can fly to Nanjing airport directly. You are warmly welcome to visit us whenever you are available!
Â
3. Q: What is the raw material of your products?
A: As general, the raw material of steel code is  Q235. Other steel is also available to clients'requirements.
Â
4. Q: What is the term of payment?Â
A:Â As general, 30% T/T down payment and balance before shipping or L/C
Â
5. Q: What is delivery times?
A: It depends on the order quantity and racking types. As general, within 15 days, for ordinary orderquant of Warhouse Rack .Â
Â
6. Q: Which port will be used as loading port?
A: Nanjing port, the closest port to us, is recommended strongly as loading port. Shanghai port is also available, but not recommended because of much higher in-land trucking transportation costs from our factory. Â
Â
7. Q: May I know the status of my order?
A:Â Yes. We will send you information and photos at different production stage of your order. You will get the latest information in time.
Â
8. Q: Are samples available?
A:Â Yes. Short sections of samples could be provided, they are free of charge, but international courier costs to be borne by clients.
Required Pallet Racking Dimension:Â
Height*Depth*Length | Number of Levels | Loading Capacity of each level | Racking Quantity |
? | ? | ? | ? |
If you are not very sure of above info, please just let us know your storage needs. Accordingly, we'll be happy to provide with our professional proposed racking solutions for your kind reference.Â
Please feel free to contact us now, if you have any inquiry or question about Warhouse Rack .  Â
Â
 Contact Us
Company Name | Anhui Botro Racking Manufacture Co,Ltd |
Website | http://www.botroracking.com/ |
Saleswoman | Rachel zhang |
Tel | 86-189-5637-6005 |
High Temperature Printing And Dyeing Pump
The main flow components of the high temperature printing and dyeing pump are the suction chamber, the impeller and the pressurized water chamber. The water suction chamber is located in front of the water inlet of the impeller, and plays the role of guiding the liquid to the impeller; the water pressure chamber mainly has three forms: a spiral pressure water chamber (volute type), a guide vane and a space guide vane; the impeller is the most important part of the pump. The important working element is the heart of the flow passage part, and the impeller consists of a cover plate and a middle blade. Before the high-temperature printing and dyeing pump works, first fill the pump with liquid, then start the high-temperature printing and dyeing pump, the impeller rotates rapidly, and the blades of the impeller drive the liquid to rotate. , in this process, the liquid in the impeller flows around the blades, and the liquid acts a lift force on the blades during the flow movement, and in turn, the blades act on the liquid with a force equal to and opposite to the lift force, and this force acts on the liquid. Do work, so that the liquid gets energy and flows out of the impeller, at this time, the kinetic energy and pressure energy of the liquid increase.
High Temperature Printing And Dyeing Pump,High Temp Pump,High Temperature Pump,Print And Dye Pump
Jiangsu Qiantu Trading Co., Ltd. , https://www.qiantupump.com