Miner's forklift squad leader's job responsibilities

1. Strictly abide by the “Employee Handbook” and various rules and regulations of the factory, obey the leadership arrangements, and complete the daily work and other work of the post;

2, in strict accordance with the process requirements, timely parking, complete the production tasks for the month on time; strengthen the connection between the upper and lower processes to ensure normal production.

3. The use, maintenance and management of the equipment to which the post belongs. Strictly implement the equipment maintenance system and operation system, carefully check the work of all parts of the equipment, and continuously improve the equipment integrity rate;

4. It is strictly forbidden to operate after drinking, and it is strictly forbidden to drive fatigue;

5. Familiar with the specifications, performance, construction, maintenance and operation methods of the equipment, and achieve “three good” and “four meetings”, and strive to improve the technical status of the equipment and the level of operation technology;

6. Establish the idea of ​​“safety first”, implement the safety management system of the plant selection, the post safety duties and the safety operation procedures and action standards of the production posts, and eliminate personal and equipment accidents;

7. Obey labor discipline and post discipline. Coordinating the various unexpected problems in the production of members of the team and other positions, not paying the price for temporary work, not pushing, not guaranteeing quality and quantity;

8. Carefully fill in the operation and maintenance records of the equipment, so that the records are complete, clear, and the data is true, and the equipment, pipelines and regional sanitation of the post are well done;

9, do anti-theft work, forklifts, forklifts locked in time;

10. Cleaning, maintenance and maintenance of vehicles;

11. Vehicles must not be handed over to others for driving.

Project Crane

A project crane is a dedicated crane for all kinds of project construction. The most commonly seen project crane is Gantry Crane. A project gantry crane can be used for road, bridge construction, metro construction, shipbuilding, tunnel construction, power plant construction and other project construction.


Metro Construction Gantry Crane


The gantry structure can be box type girder and truss type girder with light weight, small wheel pressure and reliable performance. Project crane is mainly made of steel splicing, which can be Single Girder Gantry Crane and Double Girder Gantry Crane. The hoisting mechanism cane be a hoist or a hoisting trolley. The lifting and running speed are slow, and the cost is low, which is suitable for construction.


Beam Moving Crane


Capacity: 10t - 800t or custom

Span: 6m - 32m or custom

Lift height: 6m - 32m or custom

Working duty: A5, A6, A7 or custom

Sling device: hook or special project slings

Packing: wooden case, rain cloth, reinforced bar, etc.


Gantry Crane For Shipbuilding


Weihua crane has exported to 110 countries and got a lot of praise from customers. We have confidence to provide the right products and professional solutions to you. Just tell us your projects, we will provide you with the right Gantry Crane for Railway Construction, Gantry crane for shipbuilding, Beam erection crane for highway construction, Beam Moving Crane for Road Construction, Beam Lift Crane for Highway Construction, Gantry Crane for HydroPower Station, Gantry Crane for Tunnel Construction, Boat Handling Crane, Gantry Crane for Metro Construction, etc.


Double Truss Girder Gantry Crane


Crane Project,Dam Top Gantry Crane,Spillway Gate Gantry Crane,Hydro Power Gantry Crane

Henan Weihua Heavy Machinery Co., Ltd. , https://www.weihuacranefactory.com